{"id":8072,"date":"2026-05-26T08:17:19","date_gmt":"2026-05-26T08:17:19","guid":{"rendered":"https:\/\/nextagile.ai\/blogs\/?p=8072"},"modified":"2026-05-26T08:17:20","modified_gmt":"2026-05-26T08:17:20","slug":"risk-management-in-agile","status":"publish","type":"post","link":"https:\/\/nextagile.ai\/blogs\/agile\/risk-management-in-agile\/","title":{"rendered":"Risk Management in Agile: A Practical Framework for Enterprise Teams"},"content":{"rendered":"<h2>Key Highlights of Risk Management in Agile<\/h2>\n<ul>\n<li><span style=\"font-weight: 400;\">Risk management in Agile is continuous and embedded in the delivery cycle, unlike traditional project management where risk is managed in a separate phase.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">The 18th State of Agile Report (2026) revealed a critical paradox: 55% of organisations claim end-to-end delivery visibility, yet 63% report declining software quality and slower delivery despite better reporting. This is what happens when risk is tracked but not acted on.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Agile teams use four core risk response strategies: avoid, mitigate, accept, and transfer.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">The ROAM framework (Resolved, Owned, Accepted, Mitigated) is the most widely used risk classification tool in scaled Agile environments.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">NextAgile&#8217;s agile consulting services embed structured risk management into agile transformation roadmaps for enterprises across India and Dubai.<\/span><\/li>\n<\/ul>\n<h2>Introduction<\/h2>\n<p><span style=\"font-weight: 400;\">In traditional project management, risk lives in a register. In Agile, risk lives in every ceremony. Every sprint retrospective is a risk retrospective. Every<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/scaling-agile\/what-is-pi-planning-in-agile\/\"> <span style=\"font-weight: 400;\">PI Planning event<\/span><\/a><span style=\"font-weight: 400;\"> is a risk identification session. Every dependency flag in the backlog is a risk signal. The shift from periodic risk reviews to continuous risk awareness is one of the most significant and most underestimated differences between traditional and Agile delivery.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Risk management in Agile is the practice of continuously identifying, assessing, and responding to threats and opportunities throughout the delivery lifecycle, rather than treating risk as a front-loaded phase that ends after project kickoff. The<\/span><a href=\"https:\/\/digital.ai\/resource-center\/analyst-reports\/18th-state-of-agile-report\/\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">18th State of Agile Report (2026)<\/span><\/a><span style=\"font-weight: 400;\"> identified a critical paradox: 55% of organisations say they have end-to-end delivery visibility, yet 63% report declining software quality and teams report delivering slower despite better reporting. This paradox happens when risk is tracked but not acted on. This guide gives you the techniques to close that gap.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For teams in the middle of scaling, our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/scaling-agile\/what-is-safe-transformation\/\"> <span style=\"font-weight: 400;\">SAFe transformation guide<\/span><\/a><span style=\"font-weight: 400;\"> situates risk management within the broader enterprise agility journey.<\/span><\/p>\n<h2>How Risk Management in Agile Differs from Traditional Approaches<\/h2>\n<p><span style=\"font-weight: 400;\">Traditional project management treats risk as a planning artifact. You identify risks during project initiation, log them in a risk register, assign probability and impact scores, and review the register at milestone gates. Agile rejects the assumption that most risks are knowable upfront. Complex software delivery generates emergent risks, which are risks that only become visible as the system is built and the team learns more. A risk invisible during<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/scaling-agile\/what-is-pi-planning-in-agile\/\"> <span style=\"font-weight: 400;\">PI Planning<\/span><\/a><span style=\"font-weight: 400;\"> may become obvious by sprint 3.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Dimension<\/b><\/td>\n<td><b>Traditional Risk Management<\/b><\/td>\n<td><b>Agile Risk Management<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Frequency<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Monthly or milestone-based review<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Continuous: sprint, daily, ceremony-level<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Ownership<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Project Manager or PMO<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Shared: Scrum Master, PO, Team<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Detection<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Risk register, assumptions log<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Backlog, retrospectives, dependency board<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Response speed<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Weeks to months<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Days to one sprint<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Risk attitude<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Avoidance-focused<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Embrace, learn, adapt<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Documentation<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Formal risk register<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Lightweight: ROAM board, backlog tags<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-weight: 400;\">\u00a0<\/span>Types of Risks in Agile Projects<\/h2>\n<h3>1. Technical Risks<\/h3>\n<p><span style=\"font-weight: 400;\">These include architectural decisions that prove wrong, integration failures between teams, performance bottlenecks discovered late, and security vulnerabilities in new APIs. For teams incorporating<\/span><a href=\"https:\/\/nextagile.ai\/generative-ai-consulting-services\/\"> <span style=\"font-weight: 400;\">Generative AI solutions<\/span><\/a><span style=\"font-weight: 400;\">, technical risk around model governance, hallucination rates, and data privacy adds a dimension that traditional Agile risk frameworks have not yet fully addressed. The<\/span><a href=\"https:\/\/digital.ai\/resource-center\/analyst-reports\/18th-state-of-agile-report\/\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">18th State of Agile Report<\/span><\/a><span style=\"font-weight: 400;\"> found that 84% of organisations are using or planning to use AI in the development lifecycle, with only 49% having clear guardrails in place. That gap is itself a category of technical risk.<\/span><\/p>\n<h3>2. Dependency Risks<\/h3>\n<p><span style=\"font-weight: 400;\">Dependency risks occur when your team&#8217;s sprint goal relies on output from another team, an external vendor, or a platform that does not deliver on schedule. The<\/span><a href=\"https:\/\/www.easyagile.com\/blog\/agile-predictions-insights-2026-team-collaboration-research\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">Agile State of Team Alignment 2026 report<\/span><\/a><span style=\"font-weight: 400;\"> confirms that cross-team dependency visibility is one of the top three causes of sprint rollover across enterprises. NextAgile tracks dependency risk using a program board during<\/span><a href=\"https:\/\/nextagile.ai\/workshop\/safe-pi-planning-workshop\/\"> <span style=\"font-weight: 400;\">SAFe PI Planning workshops<\/span><\/a><span style=\"font-weight: 400;\">, where inter-team dependencies are visualised and owned at the ART level from day one.<\/span><\/p>\n<h3>3. Scope Risks<\/h3>\n<p><span style=\"font-weight: 400;\">Scope risks arise when business requirements are too vague to estimate, when stakeholders change priorities mid-sprint, or when teams discover that a feature is significantly more complex than estimated. The practices of splitting stories and defining a Definition of Ready are the primary prevention techniques for scope risk. Teams with a strong backlog refinement discipline surface scope risks in refinement, before they can damage a sprint commitment.<\/span><\/p>\n<h3>4. People and Capacity Risk<b>s<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">These include team member turnover, unexpected leave, skill gaps for new technology requirements, and burnout from sustained overcommitment. Sustainable pace is one of the <\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/agile-principles\/\"><span style=\"font-weight: 400;\">12 Agile Manifesto principles<\/span><\/a><span style=\"font-weight: 400;\">. Our<\/span><a href=\"https:\/\/nextagile.ai\/workshop\/team-development-workshop-and-training\/\"> <span style=\"font-weight: 400;\">team development workshop<\/span><\/a><span style=\"font-weight: 400;\"> specifically covers how to build psychological safety and capacity discipline as a risk management practice.<\/span><\/p>\n<h2>The ROAM Framework: Risk Classification in SAFe<\/h2>\n<p><span style=\"font-weight: 400;\">ROAM is the standard risk management tool used in<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/scaling-agile\/what-is-pi-planning-in-agile\/\"> <span style=\"font-weight: 400;\">SAFe PI Planning<\/span><\/a><span style=\"font-weight: 400;\">. It classifies every identified risk into one of four categories:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Resolved: The risk has been addressed and is no longer a concern.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Owned: A specific person or team has taken accountability to manage this risk. It is not yet resolved but has an owner.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Accepted: The risk is acknowledged but the team has decided to proceed without a specific mitigation plan. Usually applied to low-probability or low-impact risks.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Mitigated: A specific action has been taken that reduces either the probability or the impact of the risk to an acceptable level.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In SAFe PI Planning, teams use a physical or digital ROAM board during the final day to classify all risks raised during team breakouts. Risks that remain Owned or Accepted require a named owner and a check-in date in the next ART sync. Our<\/span><a href=\"https:\/\/nextagile.ai\/workshop\/safe-pi-planning-workshop\/\"> <span style=\"font-weight: 400;\">SAFe PI Planning Simulation Workshop<\/span><\/a><span style=\"font-weight: 400;\"> includes a full ROAM facilitation module so teams practice risk classification in a realistic multi-team scenario before the live event.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For a broader view of how ROAM connects to your<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/scaling-agile\/pi-planning-preparation-checklist\/\"> <span style=\"font-weight: 400;\">PI Planning preparation checklist<\/span><\/a><span style=\"font-weight: 400;\">, see our end-to-end guide, which includes a phase-by-phase risk management timeline from 8 weeks before PI Planning to day-of facilitation.<\/span><\/p>\n<h2>Agile Risk Identification Techniques<\/h2>\n<h3>Retrospective Risk Review<\/h3>\n<p><span style=\"font-weight: 400;\">Add a risk lens to every retrospective. After the standard What Went Well \/ What Did Not Go Well discussion, add a third category: What Risk Did We Dodge, and What Risk Are We Carrying? Our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/how-to-improve-team-collaboration\/\"> <span style=\"font-weight: 400;\">team collaboration guide<\/span><\/a><span style=\"font-weight: 400;\"> includes retrospective facilitation techniques that make this risk lens feel natural rather than procedural.<\/span><\/p>\n<h3>Pre-mortem Analysis<\/h3>\n<p><span style=\"font-weight: 400;\">Before a sprint begins, ask the team: if this sprint fails, what will the most likely cause be? A 10-minute pre-mortem at the start of sprint planning identifies the top 3 sprint risks before work begins. The pre-mortem technique was developed by psychologist Gary Klein and has been widely validated in the<\/span><a href=\"https:\/\/hbr.org\/\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">Harvard Business Review<\/span><\/a><span style=\"font-weight: 400;\">. Combine pre-mortems with our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/sprint-planning-steps\/\"> <span style=\"font-weight: 400;\">9 sprint planning steps guide<\/span><\/a><span style=\"font-weight: 400;\"> for a complete sprint launch process.<\/span><\/p>\n<h3>Dependency Mapping in Backlog Refinement<\/h3>\n<p><span style=\"font-weight: 400;\">Tag every backlog item with any external dependencies during refinement. Flag items with open dependencies as Not Ready. This converts a mid-sprint risk into a pre-sprint decision. Our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/product-backlog-refinement\/\"> <span style=\"font-weight: 400;\">product backlog refinement guide<\/span><\/a><span style=\"font-weight: 400;\"> includes a dependency tagging convention that works with Jira, Azure DevOps, and Linear.<\/span><\/p>\n<h3>Architecture Risk Reviews<\/h3>\n<p><span style=\"font-weight: 400;\">For teams building technically complex systems, a monthly 90-minute architecture risk review surfaces technical risks invisible in story-level refinement. This is especially critical for teams adopting<\/span><a href=\"https:\/\/nextagile.ai\/generative-ai-consulting-services\/\"> <span style=\"font-weight: 400;\">Generative AI solutions<\/span><\/a><span style=\"font-weight: 400;\"> where integration risks compound quickly. NextAgile&#8217;s<\/span><a href=\"https:\/\/nextagile.ai\/workshop\/ai-for-agility-workshop\/\"> <span style=\"font-weight: 400;\">AI for Agility Workshop<\/span><\/a><span style=\"font-weight: 400;\"> covers AI-specific risk patterns that traditional architecture reviews miss.<\/span><\/p>\n<h2>Agile Risk Response Strategies<\/h2>\n<h3>Avoid<\/h3>\n<p><span style=\"font-weight: 400;\">Change the plan to eliminate the risk entirely. Example: if a specific third-party API has a history of instability, avoid depending on it by building an abstraction layer. Risk avoidance requires a decision at the PO or PM level because it typically involves scope or architecture changes.<\/span><\/p>\n<h3>Mitigate<\/h3>\n<p><span style=\"font-weight: 400;\">Take action to reduce the probability or impact of the risk before it occurs. Example: if a key team member is the only person who understands a critical integration, mitigate knowledge concentration risk through pair programming and documentation spikes.<\/span><\/p>\n<h3>Accept<\/h3>\n<p><span style=\"font-weight: 400;\">Consciously decide to proceed with the known risk without a specific mitigation plan. This is appropriate for low-probability, low-impact risks or risks where mitigation costs exceed the potential risk cost. Acceptance must be explicit and documented, not passive ignorance.<\/span><\/p>\n<h3>Transfer<\/h3>\n<p><span style=\"font-weight: 400;\">Move ownership and accountability for the risk to another party. In enterprise agile transformation, this might mean escalating an ART-level dependency risk to the Solution Train Engineer or Portfolio Management level, where the authority and resources to resolve it exist. This is a core practice in<\/span><a href=\"https:\/\/nextagile.ai\/safe-consulting-services\/\"><span style=\"font-weight: 400;\"> SAFe transformation<\/span><\/a><span style=\"font-weight: 400;\"> engagements where risk gravity, which is when individual team risks aggregate into ART-level failures before anyone has visibility to act, is the most common hidden failure mode.<\/span><\/p>\n<h2>Building a Risk Management Culture in Agile Teams<\/h2>\n<p><span style=\"font-weight: 400;\">Tools and frameworks are only effective if your team has a culture that surfaces risks early. The<\/span><a href=\"https:\/\/digital.ai\/resource-center\/analyst-reports\/18th-state-of-agile-report\/\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">18th State of Agile Report<\/span><\/a><span style=\"font-weight: 400;\"> found that 29% of respondents said a culture focused on outcomes and adaptability is what would help most, and 27% said stronger leadership support. Culture and leadership are not soft concerns. They are the primary enablers of effective risk management. Three practices build that culture:<\/span><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Psychological safety: Teams that feel safe raising risks early prevent far more problems than teams that discover risks late. Our<\/span><a href=\"https:\/\/nextagile.ai\/workshop\/team-development-workshop-and-training\/\"> <span style=\"font-weight: 400;\">team development workshop<\/span><\/a><span style=\"font-weight: 400;\"> covers practical techniques for building psychological safety in delivery teams.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Blameless post-mortems: When a risk materialises into an incident, conduct a blameless post-mortem focused on system and process failures, not individual failures. Our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/how-to-improve-team-collaboration\/\"> <span style=\"font-weight: 400;\">team collaboration guide<\/span><\/a><span style=\"font-weight: 400;\"> covers how to facilitate blameless post-mortems in both co-located and remote Agile teams.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Risk visibility: Keep your ROAM board, dependency board, and backlog risk tags visible to the whole team and stakeholders.<\/span><a href=\"https:\/\/miro.com\/\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">Miro<\/span><\/a><span style=\"font-weight: 400;\"> and<\/span><a href=\"https:\/\/www.atlassian.com\/software\/jira\/align\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">Jira Align<\/span><\/a><span style=\"font-weight: 400;\"> both support real-time risk dashboards that make invisible risks visible without requiring a dedicated risk manager.<\/span><\/li>\n<\/ol>\n<h2>Conclusion<\/h2>\n<p><span style=\"font-weight: 400;\">Risk management in Agile is not a phase or a document. It is a continuous discipline embedded in every ceremony, every refinement session, and every retrospective. Start with ROAM in your next sprint retrospective. Add a pre-mortem question to your next sprint planning. Tag dependencies in your backlog refinement this week. These three practices cost less than two hours per sprint and reduce sprint goal failure rate meaningfully within two months. NextAgile&#8217;s<\/span><a href=\"https:\/\/nextagile.ai\/agile-transformation-consulting\/\"><span style=\"font-weight: 400;\"> agile transformation consulting services<\/span><\/a><span style=\"font-weight: 400;\"> include risk management framework design and coaching as a standard component of every enterprise engagement. Contact us to assess your current risk management maturity.<\/span><\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>1. Is there a risk register in Agile?<\/h3>\n<p><span style=\"font-weight: 400;\">Agile does not mandate a traditional risk register, but most enterprise teams maintain a lightweight equivalent. In SAFe, the ROAM board serves this function. For a comparison of risk register approaches across Agile and traditional project management, see<\/span><a href=\"https:\/\/www.pmi.org\/\" rel=\"nofollow noopener\" target=\"_blank\"> <span style=\"font-weight: 400;\">PMI&#8217;s Agile Practice Guide<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h3>2. Who owns risk management in an Agile team?<\/h3>\n<p><span style=\"font-weight: 400;\">Risk ownership is shared. The Scrum Master facilitates risk identification and tracks ROAM status. The Product Owner owns prioritisation decisions related to risk response. See our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/scrum-master-skills\/\"> <span style=\"font-weight: 400;\">Scrum Master skills guide<\/span><\/a><span style=\"font-weight: 400;\"> for a breakdown of how Scrum Masters should balance risk management with their other responsibilities.<\/span><\/p>\n<h3>3. How do you manage risks in remote Agile teams?<\/h3>\n<p><span style=\"font-weight: 400;\">Remote Agile teams use digital ROAM boards (<\/span><a href=\"https:\/\/miro.com\/\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">Miro<\/span><\/a><span style=\"font-weight: 400;\">, Mural, Jira Risk Management), async retrospective tools, and explicit risk update slots in video ceremonies. Our<\/span><a href=\"https:\/\/nextagile.ai\/blogs\/agile\/how-to-improve-team-collaboration\/\"> <span style=\"font-weight: 400;\">team collaboration guide<\/span><\/a><span style=\"font-weight: 400;\"> covers specific facilitation techniques for remote risk identification in multi-timezone ART teams.<\/span><\/p>\n<h3>4. How does AI change risk management in Agile in 2026?<\/h3>\n<p><span style=\"font-weight: 400;\">The 18th State of Agile Report found that more than one quarter of AI users are already experimenting with Agentic AI for workflow execution and risk detection. NextAgile&#8217;s<\/span><a href=\"https:\/\/nextagile.ai\/workshop\/agentic-ai-workshop\/\"> <span style=\"font-weight: 400;\">Agentic AI Workshop<\/span><\/a><span style=\"font-weight: 400;\"> covers how to deploy these capabilities within your existing Agile governance framework without creating new governance gaps.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Key Highlights of Risk Management in Agile Risk management in Agile is continuous and embedded in the delivery cycle, unlike traditional project management where risk is managed in a separate phase. The 18th State of Agile Report (2026) revealed a critical paradox: 55% of organisations claim end-to-end delivery visibility, yet 63% report declining software quality&#8230;<\/p>\n","protected":false},"author":4,"featured_media":8073,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[2],"tags":[],"class_list":["post-8072","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-agile"],"_links":{"self":[{"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/posts\/8072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/comments?post=8072"}],"version-history":[{"count":1,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/posts\/8072\/revisions"}],"predecessor-version":[{"id":8074,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/posts\/8072\/revisions\/8074"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/media\/8073"}],"wp:attachment":[{"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/media?parent=8072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/categories?post=8072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nextagile.ai\/blogs\/wp-json\/wp\/v2\/tags?post=8072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}